Offshore marine piling works including design and testing works for construction of new bridge connecting to Gaga Island in Abu Dhabi.
The 1.5m diameter piles had permanent epoxy coated casing. Tests included off-shore static load test.
Offshore marine piling works including design and testing works for construction of new bridge connecting to Gaga Island in Abu Dhabi.
The 1.5m diameter piles had permanent epoxy coated casing. Tests included off-shore static load test.