Double track railway tunnel with adjacent service tunnel for high speed railway crossing main range of the Alps.
Extremely difficult geological conditions with the following design conditions:
- a maximum overburden of 900 m.
- X-section 120m² running tunnel, 15m² service tunnel
- length 22,2km
- New Austrian Tunneling Method.
- Lab testing program including assessment of Design Rock Strengths, planning & execution of uniaxial, triaxial, shear and creep test series.